Reinvent Design Technologies LLP

Call us on +91 9820941094

305, 3rd floor, Shri Sairaj Apartment near Paytan shop, Karvenagar, Pune

Mon - Sat 10 AM - 8 PM

Top

VE-Navigator for UK Compliance

Get a free Quote
Please enable JavaScript in your browser to complete this form.
[/vc_column]
green building certifications

Guidance and facilitation in undertaking SBEM and DSM methodology analyses for Part L2 compliance checks and EPC generation

Our patented VE-Navigator technology provides you with a robust and detailed step-by-step structured workflow for Part L2 compliance and EPC generation for 2013 (England), 2014 (Wales) and 2010 (England/Wales).

  • England & Wales Compliance.
  • Part L2 2013 (England), 2014 (Wales) and 2010 (England/Wales) compliance checks.
  • 2013 (England), 2014 (Wales) and 2010 (England/Wales) EPC generation.
  • Both SBEM and/or DSM methodology.
  • Revolutionary easy to use step-by-step guidance from model setup, to data assignment, to simulation.
  • Concise reporting with interactive filters for easy interrogation.
  • Unique built-in QA functionality – design team collaboration and tracking.
  • Improved modelling efficiency and accuracy.
  • Significant time saving leading to rapid iteration.

This innovative tool streamlines the process and ensures no step is missed.The navigators provide:

  • Step-by-step guidance and instruction across compliance rules and process
  • Confidence that each key stage has been addressed
  • Unique reports which compare Notional and Actual models (DSM)
  • Identifies key areas where design ratings can be improved (DSM)
  • Unique built in QA functionality
    • Design team collaboration: add and share notes
    • Track team progress: date/user stamp check box
    • Integrated guidance notes
  • Analysis Automation

For both Part L2A 2013 & 2010 DSM the Navigator analyses the results of the regulations calculation and provides guidance to help streamline the design process to produce a minimally compliant building by providing two main outputs:

  • ‘Key model inputs comparison’
    • Quick check assessment for use at early project stages
    • Demonstrates whether you stand a good chance of passing or not
    • Clearly shows what level of efficiencies the project is likely to achieve
  • ‘Identify dominant issues for improvement’
    • Quickly achieve the efficiencies required for compliance
    • Tailored guidance on where to focus your efforts based on your design
    • Identifies which strategies will be the most effective in reducing dominant loads

Dependant on the route to compliance and whether the project is a level 3, 4 or 5 building the Navigators produce specific tailored reportage: 

  • Part L2A 2013 & 2010 SBEM
    • SBEM calculations summary
    • SBEM calculation details
    • BRUKL document
    • EPC
  • Part L2A 2013 & 2010 DSM
    • Pass Results (BER/TER)
    • Carbon dioxide emissions summary
    • Energy summary
    • Actual Building – carbon & energy breakdown (heat, cool, AUX, lights, DHW)
    • Actual System – carbon & energy breakdown
    • Notional System – carbon & energy breakdown
    • Notional Building – carbon & energy breakdown
    • Criterion 3 solar gain check
    • BRUKL document
    • EPC

Source:- https://www.iesve.com/software/virtual-environment/nav-uk-compliance

We’re here to help and answer any question you might have.

Free Consultation About RDT Design Technologies LLP

Testimonial

"Our experience with RDT Corp has been outstanding. They delivered a customized solution that addressed all our requirements and exceeded our expectations. Their commitment to excellence is evident in everything they do."

"RDT Corp provided us with a comprehensive IT strategy that perfectly aligned with our business goals. Their proactive approach and attention to detail have made a significant impact on our company's growth. Their services are worth every penny."

"RDT Corp's expertise in digital transformation helped us streamline our processes and boost productivity. Their team is incredibly knowledgeable and always goes the extra mile to ensure our needs are met. We're thrilled with the results!"